Lloyd's List is part of Maritime Intelligence

This site is operated by a business or businesses owned by Maritime Insights & Intelligence Limited, registered in England and Wales with company number 13831625 and address c/o Hackwood Secretaries Limited, One Silk Street, London EC2Y 8HQ, United Kingdom. Lloyd’s List Intelligence is a trading name of Maritime Insights & Intelligence Limited. Lloyd’s is the registered trademark of the Society Incorporated by the Lloyd’s Act 1871 by the name of Lloyd’s.

This copy is for your personal, non-commercial use. For high-quality copies or electronic reprints for distribution to colleagues or customers, please call UK support at +44 (0)20 3377 3996 / APAC support at +65 6508 2430

Printed By

UsernamePublicRestriction

UK Department for Energy Security and Net Zero 070324

UK Department for Energy Security and Net Zero 070324

Published: 7 March 2024

Department for Energy Security & Net Zero

NET ZERO TEESSIDE PROJECT

THE PLANNING ACT 2008 AND THE INFRASTRUCTURE PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2017

NOTICE OF A DECISION ON AN APPLICATION FOR AN ORDER GRANTING DEVELOPMENT CONSENT FOR EIA DEVELOPMENT

The Secretary of State for Energy Security and Net Zero (“the Secretary of State”) gives notice under regulation 31(2) of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 that a determination has been made on an application made by Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (“the Applicants”) for development consent under the Planning Act 2008 (“the 2008 Act”) for development that constitutes “Environmental Impact Assessment development” as defined in the 2017 Regulations.

The application is for the onshore elements of a full chain Carbon Capture, Usage and Storage project comprising a number of elements including a new gas-fired electricity generating station (with an electrical output of up to 860 megawatts) with post combustion carbon capture plant; gas, electricity and water connections (for the electricity generating station); a carbon dioxide (CO) pipeline network (a ‘gathering network’) for gathering CO from a cluster of local industries on Teesside; a high pressure CO compressor station and a CO export pipeline.

The Secretary of State has decided, following consideration of the report of the Examining Authority who conducted an examination into the application, that development consent should be granted for the proposed development.

The statement of reasons for deciding to make an Order granting development consent, which has been prepared by the Secretary of State under section 116 of the 2008 Act and regulation 31(2) of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017, containing the content of the decision, the requirements imposed in connection with the development, the main reasons and considerations on which the decision is based including relevant information about the participation of the public, a description of the main features to avoid, reduce and offset any major adverse effects of the development, is published on the Planning Inspectorate`s website:

https://infrastructure.planninginspectorate.gov.uk/projects/north-east/the-net-zero-teesside-project/.

The statement of reasons contains the information required by regulation 30(2) including information regarding the right to challenge the decision and the procedures for doing so.

Hard copies of the decision documentation will also be available to inspect at the Planning Inspectorate’s offices (by appointment using the contact details below):

The Planning Inspectorate, National Infrastructure Directorate, Temple Quay House

Bristol BS1 6PN.

To make an appointment for inspection of the documents contact the Planning Inspectorate on 0303 444 5000 or email [email protected].

Copies of the Secretary of State’s decision letter and the text of the Order can be obtained by writing or sending an e-mail to the Planning Inspectorate. No charge will be made for this service.

UsernamePublicRestriction

Register