Dynagas secures charter extension from Yamal LNG
Dynagas has secured an extension of 180 days to its 15-year contract with Yamal LNG as the project’s second train in Russia’s Arctic region begins production earlier than planned
The vessel was delivered to the project after a five-year special survey and drydocking in Singapore